2012年6月7日星期四

Montage it - Week 2

These are the photomontages for exercise.
 Daytime- The background of this image i took from  a chinese famouse grassland named Hu Lun Bei Er. i put my model in it and adjust the lighting and contrast to make them suit for each other. Also, i put some people in it to show how the building and environment works.
 This image show the interior of first floor of my studio.The first floor is for exhibition of Edruardo Chillida' art works. Thus, i put some visitors and his works in it. Moreover, i use different materials to decorate the interior room.
This image shows the nighttime view of the studio and surroundings. Also, the lighting shows the bright interior in the dark background and it make a strong contrast to emphasize the studio.

2012年5月28日星期一

Montage it- Final

Artist - Eduardo Chillida
Concept - Combination of various froms.

Dusk time
During dusk, the building turns into a shadow as the sun sets.
Interior view from inside room to outside
This is a image of showroom on first floor. The sloping pillars cast interesting shadows throughout the space.

Day time
The image shows how the studio works. There are two large rooms for work and exhibition. The upper room is for exhibition and the ground floor is for working.

2012年5月14日星期一

Montage it - Week 1

Artist:
Eduardo Chillida
Concept:
Combination of various forms.

 Draft model:
This model is just an idea of the model.For the final model, is had been developed.

Final Model:
I use various cubes to present the concept which is the combination of various forms. The numbers of  horizontal and slanting cubes and the irregular window frames can unit together.







 

Model in background:

2012年5月7日星期一

Model it - 1:50 Fisher House

This image shows the unfinished model of Fisher House with the basement and the interior of first floor.
All parts of entire removable model.
The basement of the Fisher House.
The first floor of Fisher House. Also, for the left part, there is no second floor in it , so i made  the walls together.
The second floor for the right side section.
The basement and the first floor. The exterior wall of basement is painted into black color. but the wall contains the texture of walls.
Another view of basement and first floor.
The second floor of Fisher house.
The image shooted from inside Fisher House to outside.
The kitchen space.
Staircase.
 The small semi-circle part on the roof is the cover of chimney. Also, it works as a lock for seperating the model.
Details on the walls. The scratches on the wall present the various pieces of timber on the real Fisher House.
Another view of entire Fisher House model.

Model it - Site plan of Fisher House

The overview of Stie plan of Fisher House.
For the surface of the land, i use lots ofsawdust on it to present the soil on the real landscap.
Front view of the site plan and the trees.
The drive way on the back of Figher house.
The image shows how the Fisher house set on the site.

Draw it - Poster

2012年5月1日星期二

2012年4月21日星期六

Model it- Barcelona pavilion

Barcelona pavilion

This is the overview of the final model.
a small swimming pool.
a large swimming pool.
For the swimming pool, first i cut a wave shape form on a thinner balsa wood. then it covered by a transparent plastic sheet. Therefore, it shows the waving condition of a swimming pool.

These two images shows the removable roofs of this model.

This is the staircase of this model.

A different view of Barcelona Pavilion

Model it-practise 1

In class exercise:


These two images show my first models in this section. But the one of them was not finished. To connect the adjacent two facade, i put  a small cube in the corner to make it well-set.


The two images above are the final houses we made in the end of the class.